Old City Hall Restoration

PRE-CONSTRUCTION /// General Contracting

Developed For

Old Town Hall Bell Tower Restoration

LOCATION

Lake Charles, LA

Superintendent

Josh Church

ARCHITECT

Goodloe Architecture

This project involves reinforcing and rebuilding the Bell Tower with a new steel structure that will serve as the backbone for the roof and all decorative wood columns, handrails, and framing. Work also includes repainting all exterior surfaces, repointing brick, and replacing the clay tile roof, SBS roof, copper roof vents, gutters, and downspouts. In addition, windows will be reglazed and painted, miscellaneous electrical upgrades completed, and new sidewalks added at the north and south entries.

CONTACT US

Let’s Get Started

Contact our team for answers to all your questions and inquiries.

LAKE CHARLES

337.433.4300

LEESVILLE

337.238.3743

ALEXANDRIA

318.460.0006

x
PAT WILLIAMS CONSTRUCTION

HOURS: 7.00 AM – 5.00 PM

LAKE CHARLES

LEESVILLE

ALEXANDRIA