The Maplewood Middle School – Phase II project involved the construction of a new multipurpose building consisting of an auditorium along with a stage area, table/chair storage areas, restrooms, a lobby and a porch. This project also included a six classroom pod building along with connecting covered walkways.
Calcasieu Parish School Board
Pre-Construction, Design/Build, General Contracting
08/15/2010