This project consists of the construction of a 39,118 sq. ft. (gross enclosed area) Warehouse/Administration building (pre-engineered steel) with a covered loading dock, canopies, paved parking/driveway areas with all required finishes, civil work, utilities, mechanical and electrical systems.
Chennault International Airport Authority
Pre-Construction, Design/Build, General Contracting
09/12/2018