Johnny Downs Sports Complex Rejuvenation Project Contract B was to reconstruct the existing baseball and softball practice fields. The work included demolition and removal of existing parking lot pipe barrier, chain link fence and backstop, storm drainage pipe and catch basins, foul poles, etc. Additionally, installing/constructing erosion control measures, filling and grading, irrigation water piping, valves, and connections, irrigation water reels, chain link fence and gates, chain link backstops, and foul poles was also completed.
City of Alexandria
General Contracting
03/01/2021